海陵区闸坡镇坑督水库除险加固工程的闸址位于阳江市,该工程为三级,建筑物主体为三级,非主体建筑物为四级,建筑内容含有水库的拆除和重建工程;挡水工程;泄洪工程;引水工程;管养房工程;永久进库公路工程;启闭设备安装工程;拦污设备安装工程等。计划开工日期为2022年5月,计划竣工日期为2022年9月,工期总共120日。合同价为:人民币壹仟零叁拾捌万伍仟柒佰贰拾元叁角(RMB¥10385720.3元)毕业设计首先核对工程量清单中的工程量,确定主体工程和分部工程的施工方案,确定施工类型、施工机械和施工期限;然后计算劳动力、材料、机械、风、水和电的单价,并计算分部分项工程的单价;最后,计算每个子项目的总价、测量的项目成本和其他项目成本,汇总各部分价格并计算形成投标价格。
关键词:工程量清单;施工组织设计;投标文件;水库加固
Abstract
The gate site of kengdu reservoir danger removal and reinforcement project in Zhapo Town, Hailing District is located in Yangjiang City. The project is level III, the main building is level III, and the non main building is level IV. the building content includes the demolition and reconstruction of the reservoir; Water retaining works; Flood discharge works; Water diversion works; Housing maintenance project; Permanent access road works; Hoisting equipment installation works; Sewage blocking equipment installation works, etc. The planned commencement date is may 2022 and the planned completion date is September 2022. The construction period is 120 days in total. The contract price is: RMB ten million three hundred and eighty five thousand seven hundred and twenty point three (RMB 10385720.3). This graduation project first checks the quantities in the bill of quantities, determines the construction scheme of main divisional and subdivisional works, and determines the construction method, construction machinery and construction period; Then calculate the unit price of labor, materials, machinery, wind, water and electricity, and calculate the unit price of divisional and subdivisional works; Finally, calculate the total price, measure project cost and other project costs of each sub project, summarize the prices of each part and calculate the bid price.
Keywords: bill of quantities; construction organization design; bidding documents; reservoir reinforcement
目 录
二、安全管理资源配置合理、措施符合相关安全技术(操作)规程的 130